X.1 Class



Experimental Cruiser Submarine

Experimental Cruiser Class Submarine - X1

  • Cruiser Class
  • X1

The idea of a cruiser submarine was conceived as early as 1915 but was not put into practice until 1921.

She was laid down on the 2nd November 1921 at the Naval Dockyard Chatham and completed on 23rd September 1925, she commissioned in December 1925. MAN engines had been fitted to her as they had been seen to be efficient when fitted in German U-boats of W.W.I. Unfortunately in the case of X1 this did not occur and she was to suffer with engine problems all her short life.

These engine problems proved to be her undoing and she was placed in Reserve in 1933, taken off the active list in 1936 and scrapped in 1937.

1 Built

Submarine Builder Built
X1 H.M. Dockyard, Chatham. 1921 - 1925

Technical Information

Displacement (tons): 2,780 sf.
3,600 sm.
Length (Feet): 363.5
Breadth (Feet): 29.75
Draught/Height (Metric): na
Machinery: 2 x 6,000 H.P. MAN Diesels.
2,600 H.P. Electric Motors
Speed (kts): 19.5 kts sf
9 kts sm
Oil Supply (tons): na
Armament: 6 x 21 inch bow tubes.
2 x 2 5.2 inch guns.
4 x machine-guns.
Range: 12,400 nm sf
Complement: 8 Officers and 101Ratings.